Arch Interior Design StudioAI assisted interiors Call us
ServicesHome Interior DesignModular Kitchen DesignBedroom Interior DesignWardrobe DesignLiving Room Interior DesignFalse Ceiling and Lighting DesignBathroom Interior DesignHome RenovationAI Interior Design and 3D RendersTurnkey InteriorsOffice Interior Design1 BHK Interior Design2 BHK Interior Design3 BHK Interior DesignVilla and Bungalow Interior DesignAll services
How we work
Mumbai areasAndheriBandraPowaiWorliJuhuGoregaonMaladBorivaliChemburGhatkoparLower ParelKandivaliAll Mumbai areas
Other citiesThaneNavi MumbaiPuneDelhiGurugramNoidaBengaluruHyderabadChennaiAhmedabadKolkataJaipurSuratLucknowChandigarhIndoreNagpurKochiGoa
GuidesNew flat checklist2 BHK interior ideasHow AI interior design worksAI room design from a photoModular kitchen layoutsSliding vs hinged wardrobesPlywood vs HDHMR vs MDFMonsoon proof interiorsPooja room designsFalse ceiling designsTV unit design ideasAll guides
Free toolsPaint CalculatorTile CalculatorTV Size and Viewing Distance CalculatorBed and Wardrobe Fit CheckerInterior Style QuizAll free tools
AboutContact

Planning and AI guide

New flat interior checklist: what to do before and after possession

The weeks around possession decide how smoothly your interiors go. This checklist covers what to do, in order, so you can move in sooner and with fewer surprises.

All interior guides

In short

  • Start design as soon as you have the final floor plan, before possession.
  • Inspect and report defects in writing at possession, then get society permission.
  • Plan every electrical point before carpentry; budget 6 to 10 weeks for a 2 BHK.
Talk to a designer

Before possession

  • Get the final floor plan with dimensions from the builder
  • Start design and AI renders, so drawings are ready on possession day
  • Decide your budget range and must haves for each room
  • Ask the builder for the electrical, plumbing and AC drawings

At possession

  • Inspect walls, floors, windows and doors for damage and seepage
  • Check every switch, socket and tap
  • Test bathroom floors with water for slope and drainage
  • Photograph everything and report defects to the builder in writing

Society and building rules

Most societies have rules for interior work: working hours, noise, material movement, lift use and debris disposal. Some require a deposit and a written work permit. Get these in writing before work starts.

Plan electrical points early

Mark sockets for the TV wall, bedside, study desk, kitchen appliances, water purifier and AC before carpentry begins. Moving a point after units are built is costly.

Order of work

  • Civil changes and waterproofing
  • Electrical and plumbing
  • False ceiling
  • Carpentry and modular units
  • Painting
  • Lights, fittings and appliances
  • Deep clean and styling

Documents and permissions

  • Possession letter and the builder's fit out guidelines
  • Society interior work application and NOC
  • Contractor and worker details for the security desk
  • Refundable deposit receipt, if the society asks for one
  • Electrical load sanction if you are adding heavy appliances

Electrical points checklist

AreaPoints to plan
TV wallTV, set top box, router, soundbar, spare
BedsideTwo sockets each side plus a USB point
KitchenHob, chimney, microwave, mixer, purifier, fridge, dishwasher
StudyLaptop, monitor, lamp, printer
BathroomsGeyser, exhaust, mirror light, shaver point
BalconyWashing machine, outdoor light

Snag list before final payment

  • Shutters aligned, closing softly, no gaps
  • Drawers run smoothly at full load
  • Edges banded, no exposed board
  • Every light and switch working as marked
  • No paint on fittings, glass or floors
  • Bathroom floor slopes to the drain
  • Deep clean done, including inside units

Budget tips that do not cut quality

Spend on what you touch every day: kitchen hardware, drawer channels, wardrobe interiors and mattresses. Save on things that are easy to upgrade later: decor, rugs, some light fittings and accent furniture. Avoid saving on waterproofing and electrical work, which are expensive to redo.

A week by week timeline for a 2 BHK

WhenWhat happens
4 to 8 weeks before possessionDesign, AI renders, material selection, quotation
Possession weekInspection, defects list, society paperwork
Weeks 1 to 2Civil changes, waterproofing, electrical and plumbing
Weeks 2 to 4False ceiling, carpentry begins
Weeks 4 to 7Modular installation, painting
Weeks 7 to 9Lights, fittings, loose furniture, snag list
Week 9 to 10Deep clean, styling, move in

Builder handover items to check closely

  • Window and sliding door alignment and locks
  • Bathroom waterproofing: run water and check the flat below if possible
  • Electrical load and earthing
  • Main door quality and lock
  • Kitchen platform level and sink drainage
  • Balcony slopes and outlet
  • Intercom, video door phone and gas connection

Things people forget until too late

  • Curtain tracks and blinds measured before the ceiling
  • Space and plumbing for a washing machine and dryer
  • A spot for the inverter and its battery
  • Mosquito mesh on windows
  • Hooks and rails in bathrooms
  • Wi Fi router position with power and a central location
  • A charging point near the entrance

Want us to design it for you?

If you would rather have a designer handle it, we offer turnkey interiors, 2 bhk interior design, 3 bhk interior design, with AI renders of your own rooms before any work starts. We work across Mumbai, Thane and Navi Mumbai, including interior designers in Thane, interior designers in Navi Mumbai, interior designers in Kanjurmarg, and take projects in other major cities.

Related guides: 2 BHK interior ideas, How AI interior design works, AI room design from a photo.

Free tool: Tile Calculator

Written by

The Arch Interior Design Studio team

An interior design studio in Mumbai that plans homes room by room and shows clients realistic renders before anything is built.

More about us

FAQ

New flat checklist: questions people ask

Still unsure? A short call usually answers it.

Call us
When should I start interior design for a new flat?

As soon as you have the final floor plan, ideally a month or two before possession.

How long after possession can I move in?

For a typical 2 BHK with full interiors, around six to ten weeks if design is ready at possession.

Should we do interiors before moving in?

If you can, yes. Dust and noise from carpentry make living there difficult, and the work goes faster in an empty flat.

What should be checked at possession?

Seepage, cracks, floor levels, windows, doors, every switch and tap, and bathroom drainage. Report defects in writing.

Do we need society permission for interiors?

Almost always. Most societies ask for an application, contractor details and sometimes a deposit.

What is the first thing to do after getting keys?

Inspect and document defects, then get society permissions in place before any work starts.

Can we move in before interiors are finished?

It is possible if work is phased, but dust and noise make it hard. Most families wait for at least the kitchen and bedrooms.

Want this done for your home?

Call us for a free first consultation. We will show you your own rooms before any work starts.

Call for a free consultation
Call for a free consultation